đźšš Free Worldwide Shipping on All Orders!Shop Now

1 / 4
S Curve Guitar Strap, Hermann Oak
S-Curved Hermann Oak
When you’re rockin’ and rollin’, you want something that won’t give you crazy neck cramps. This groovy s-curved guitar strap provides support and comfort for all that shredding (although, we’re not responsible for head bangin’ headaches). Perfect for any vibes you’re strumming.
Made of legendary Hermann Oak leather. Designed for comfort and longevity.
More details:
Made of premium Hermann Oak leather that is stiff, durable, and will not stretch over time.
Consistent and fine grain.
Dyed leather is struck-through, so it will keep its color, even if scratched.
Plated grain makes for a smooth, slightly-textured touch.
Adjustable 2-piece guitar strap designed for great playing comfort.
Durable strap works great for both electric and acoustic guitars.
Colors: Black, brown, natural.
Dimensions: Width: 3” ; Strap length: 36-1/2”; Adjustable strap length: 23-½”
When you’re rockin’ and rollin’, you want something that won’t give you crazy neck cramps. This groovy s-curved guitar strap provides support and comfort for all that shredding (although, we’re not responsible for head bangin’ headaches). Perfect for any vibes you’re strumming.
Made of legendary Hermann Oak leather. Designed for comfort and longevity.
More details:
Made of premium Hermann Oak leather that is stiff, durable, and will not stretch over time.
Consistent and fine grain.
Dyed leather is struck-through, so it will keep its color, even if scratched.
Plated grain makes for a smooth, slightly-textured touch.
Adjustable 2-piece guitar strap designed for great playing comfort.
Durable strap works great for both electric and acoustic guitars.
Colors: Black, brown, natural.
Dimensions: Width: 3” ; Strap length: 36-1/2”; Adjustable strap length: 23-½”
Select Color
From $16.50
Original: $55.00
-70%S Curve Guitar Strap, Hermann Oak—
$55.00
$16.50Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
S-Curved Hermann Oak
When you’re rockin’ and rollin’, you want something that won’t give you crazy neck cramps. This groovy s-curved guitar strap provides support and comfort for all that shredding (although, we’re not responsible for head bangin’ headaches). Perfect for any vibes you’re strumming.
Made of legendary Hermann Oak leather. Designed for comfort and longevity.
More details:
Made of premium Hermann Oak leather that is stiff, durable, and will not stretch over time.
Consistent and fine grain.
Dyed leather is struck-through, so it will keep its color, even if scratched.
Plated grain makes for a smooth, slightly-textured touch.
Adjustable 2-piece guitar strap designed for great playing comfort.
Durable strap works great for both electric and acoustic guitars.
Colors: Black, brown, natural.
Dimensions: Width: 3” ; Strap length: 36-1/2”; Adjustable strap length: 23-½”
When you’re rockin’ and rollin’, you want something that won’t give you crazy neck cramps. This groovy s-curved guitar strap provides support and comfort for all that shredding (although, we’re not responsible for head bangin’ headaches). Perfect for any vibes you’re strumming.
Made of legendary Hermann Oak leather. Designed for comfort and longevity.
More details:
Made of premium Hermann Oak leather that is stiff, durable, and will not stretch over time.
Consistent and fine grain.
Dyed leather is struck-through, so it will keep its color, even if scratched.
Plated grain makes for a smooth, slightly-textured touch.
Adjustable 2-piece guitar strap designed for great playing comfort.
Durable strap works great for both electric and acoustic guitars.
Colors: Black, brown, natural.
Dimensions: Width: 3” ; Strap length: 36-1/2”; Adjustable strap length: 23-½”
























